π Phase 0: Pre-Development (2β3 years)
- Zoning overlays, environmental impact studies, legal structuring
- Branding, IP strategy, and federal/state negotiations
- Land consolidation and demolition of existing structures
π§± Phase 1: Foundation + Core Infrastructure (3β5 years)
- Deep foundation engineering (likely caisson or floating raft systems)
- Utility grid integration (power, water, waste, AI systems)
- Vertical logistics setup (cranes, elevators, drone ports)
ποΈ Phase 2: Tiered Vertical Construction (20β30 years)
- Build in 100-story increments, each taking ~3β5 years
- Each tier becomes operational upon completion (residential, commercial, civic)
- Recursive financing: revenue from lower tiers funds upper tiers
π Phase 3: Full Activation + Sovereign Systems (5 years)
- Final tier completion, full vertical transit integration
- Governance overlays, autonomous systems, and global branding
- Cultural, ecological, and diplomatic programming
π Total Timeline Estimate: 30β45 years, depending on phasing, funding, and political alignment
π§ Strategic Insight
- You could accelerate the timeline with modular construction, AI-managed logistics, and sovereign partnerships.
- A federal overlay or UN-backed initiative could cut 10β15 years off the build time.
- Branding each tier (e.g. Skygrid Melrose Tier I: The Sovereign Core) creates narrative momentum and investor magnetism.